CAGE 1DQZ7 - WHEELER ELECTRIC, INC.
USA

WHEELER ELECTRIC, INC.

CAGE Code: 1DQZ7
DUNS: 033967407
469 W 16TH ST
IDAHO FALLS ID 83402-4226
UNITED STATES

Telephone: 2085221906
Fax: 2085225927


WHEELER ELECTRIC, INC. is an Active Commercial Supplier with the Cage Code 1DQZ7 and is tracked by Dun & Bradstreet under DUNS Number 033967407.

Additional Data For CAGE 1DQZ7

SIC Code 1:1731
Status:A
Type:F
Size:A
Primary Business:N
Type of Business:N
Woman Owned:N
CAO:S0602A
ADP CNT CT:HQ0339

USA Government Contracting Activity for 1DQZ7

Tuesday, June 27, 2017
($0.74)
1400: Department of the Interior
140R10: PACIFIC NW REGION PN 6615

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Wednesday, March 1, 2017
($1,000.00)
1400: Department of the Interior
140R14: UPPER SNAKE RIVER AREA OFFICE

B: PURCHASE ORDER
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE DELIVERY DATE.
6110: ELECTRICAL CONTROL EQUIPMENT

  INR16PX00080     R15PS01747  
Monday, January 23, 2017
$0.00
1400: Department of the Interior
140R10: PACIFIC NW REGION PN 6615

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Thursday, December 15, 2016
$760.00
1400: Department of the Interior
140R10: PACIFIC NW REGION PN 6615

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Friday, November 18, 2016
$0.00
1400: Department of the Interior
140R10: PACIFIC NW REGION PN 6615

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Tuesday, September 6, 2016
$0.00
1400: Department of the Interior
140R10: PACIFIC NW REGION PN 6615

B: PURCHASE ORDER
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE DELIVERY DATE.
6110: ELECTRICAL CONTROL EQUIPMENT

  INR16PX00080     R15PS01747  
Friday, June 10, 2016
$158,861.85
1400: Department of the Interior
140R10: PACIFIC NW REGION PN 6615

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Monday, April 11, 2016
$0.00
8900: Department of Energy
895031: PMAS-WESTERN-DESERT SW REGION

D: DEFINITIVE CONTRACT
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT, MODIFICATION 0019- THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE EXCESS FUNDS FROM THE CONTRACT SO IT CAN BE CLOSED OUT. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Tuesday, March 1, 2016
($8,330.00)
8900: Department of Energy
00007: IDAHO OPERATIONS OFFICE

C: DELIVERY ORDER
INSTALL ELECTRICAL METERS IN SELECT BUILDINGS AT INTEC. DEOBLIGATION OF UNUSED FUNDS FOR CLOSEOUT
6110: ELECTRICAL CONTROL EQUIPMENT

  DEDT0006447     DEEM0002169  
Wednesday, January 13, 2016
$4,481.04
1400: Department of the Interior
00010: BOISE REGIONAL OFFICE

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Tuesday, January 5, 2016
$0.00
1400: Department of the Interior
00010: BOISE REGIONAL OFFICE

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Wednesday, December 23, 2015
$209,740.00
1400: Department of the Interior
00014: SNAKE RIVER EAST AREA OFFICE

B: PURCHASE ORDER
AC&DC DISTRIBUTION PANELS
6110: ELECTRICAL CONTROL EQUIPMENT

  INR16PX00080     R15PS01747  
Monday, November 9, 2015
$3,200.00
1400: Department of the Interior
00010: BOISE REGIONAL OFFICE

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Thursday, November 5, 2015
$5,963.48
1200: Department of Agriculture
32SD: USDA ARS WBSC 32SD

B: PURCHASE ORDER
INSTALLATION- DIESEL STANDBY GENERATOR ADD NEW CIRCUIT TO MAIN BUILDING GENERATOR-RUTGER
6110: ELECTRICAL CONTROL EQUIPMENT

  AG32SDP150583     AG-0202-S-15-0010  
Friday, October 16, 2015
$0.00
1400: Department of the Interior
00010: BOISE REGIONAL OFFICE

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Thursday, September 3, 2015
$38,265.00
1200: Department of Agriculture
0415: USDA ARS PWA 0415

B: PURCHASE ORDER
INSTALLATION- DIESEL STANDBY GENERATOR ADD NEW CIRCUIT TO MAIN BUILDING GENERATOR-RUTGER
6110: ELECTRICAL CONTROL EQUIPMENT

  AG32SDP150583     AG-0202-S-15-0010  
Friday, May 29, 2015
$719,207.00
1400: Department of the Interior
00010: BOISE REGIONAL OFFICE

D: DEFINITIVE CONTRACT
IGF::OT::IGF PALISADES POWER LINE REROUTE, PALISADES PROJECT, IDAHO
Y1MZ: CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION

  INR15PC00082     R15PS00154  
Wednesday, April 15, 2015
$0.00
8900: Department of Energy
00007: IDAHO OPERATIONS OFFICE

B: IDC
METER INSTALLATION FOR EM CHANGE THE CONTRACT SPECIALIST
6110: ELECTRICAL CONTROL EQUIPMENT

  DEEM0002169     DE-SOL-0004088  
Friday, April 10, 2015
$0.00
8900: Department of Energy
00007: IDAHO OPERATIONS OFFICE

C: DELIVERY ORDER
MODIFICATION TO CHANGE PERIOD OF PERFORMANCE ON INSTALL ELECTRICAL METERS IN SELECT BUILDINGS AT INTEC.
6110: ELECTRICAL CONTROL EQUIPMENT

  DEDT0006447     DEEM0002169  
Tuesday, November 25, 2014
$136,391.00
8900: Department of Energy
00066: WESTERN-DESERT SOUTHWEST REGION

D: DEFINITIVE CONTRACT
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT, MODIFICATION 0019- THE PURPOSE OF THIS MODIFICATION IS TO INSTALL (3) 230 KV THREE-PHASE CONDUCTOR BETWEEN THE DAVIS NO. 1 APPROACH STRUCTURE 13/2 AND THE TOPOCK NO. 1 APPROACH STRUCTURE 13/3. THE FOLLOWING SHALL ALSO INCLUDE (1) NEW -INCH OGW BETWEEN STRUCTURES 13/2 AND 13/3. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Friday, September 26, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MODIFICATION 0017. THE PURPOSE OF MODIFICATION 0017 IS TO PROVIDE 2 INCHES OF GRAVEL TO THE EXISTING SURFACE WITHIN THE SUBSTATION AND THE AREA OUTSIDE THE SUBSTATION USED TO OPERATE THE GATE, AS WELL AS MODIFY THE HEIGHT OF 23 SWITCH OPERATING PLATFORMS, IN AN URGENT TIMEFRAME. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Monday, September 15, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MODIFICATION 0017. THE PURPOSE OF MODIFICATION 0017 IS TO PROVIDE 2 INCHES OF GRAVEL TO THE EXISTING SURFACE WITHIN THE SUBSTATION AND THE AREA OUTSIDE THE SUBSTATION USED TO OPERATE THE GATE, AS WELL AS MODIFY THE HEIGHT OF 23 SWITCH OPERATING PLATFORMS, IN AN URGENT TIMEFRAME. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Monday, September 8, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00007: IDAHO OPERATIONS OFFICE

IDC Indefinite Delivery Contract
METER INSTALLATION FOR EM THIS MODIFICATION CORRECTS DOE SYSTEM ERROR, WHICH HAS NO IMPACT ON THE ACTUAL AWARD.
6110: ELECTRICAL CONTROL EQUIPMENT

  DEEM0002169     DE-SOL-0004088  
Friday, August 29, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00007: IDAHO OPERATIONS OFFICE

IDC Indefinite Delivery Contract
METER INSTALLATION FOR EM EXERCISE OPTION 2
6110: ELECTRICAL CONTROL EQUIPMENT

  DEEM0002169     DE-SOL-0004088  
Wednesday, June 25, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MODIFICATION 0016 THE PURPOSE OF MODIFICATION 0016 IS TO CHANGE THE 3 - 1/C 350 KCMIL JUMPERS TO 3 - 2/C 750 KCMIL JUMPERS BETWEEN THE LT-201 TRANSFORMER AND THE SSB SAFETY SWITCH AS SHOWN ON DRAWING LNG 1600. ALSO MODIFICATION 0016 IS TO INCLUDE FURNISH AND INSTALL TWENTY-FOUR (24) COMPRESSION DEADENDS AND EIGHTEEN (18) 18" COMPRESSION SPACERS FOR THE 230 KV STRAIN BUS CONNECTIONS AND JUMPER DROPS AS SHOWN ON DRAWING LNG 1112. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Thursday, June 19, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
PURPOSE IS TO FUND THE PULLING OF ADDITIONAL CONTROL CABLE LONGTIN SUBSTATION, STAGE 02 MODIFICATION 0015 IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Wednesday, May 7, 2014
$522,930.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MODIFICATION 0014 IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Wednesday, April 9, 2014
$10,000.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Tuesday, April 8, 2014
$39,850.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MODIFICATION 0012 - INSTALL RIP RAP, WELD TRANSFORMERS TO FOUNDATION PLATES, MODIFY JOIST GIRDERS, AND CHANGE DATE FOR COMPLETION OF TOS. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Monday, March 31, 2014
$31,154.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MODIFICATION 0011 - CHANGE EQUIPMENT PLATFORMS, ADD CONDUIT, AND DELETE INSTALLATION OF OIL PUMP. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Thursday, March 27, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MOD 0010 - ADMIN MOD TO ADD CRD IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Wednesday, March 19, 2014
$1,500.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MODIFICATION 0009 - CHANGE HEIGHT OF SURGE ARRESTOR SUPPORT IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Friday, March 14, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00007: IDAHO OPERATIONS OFFICE

DO Delivery Order
INSTALL ELECTRICAL METERS IN SELECT BUILDINGS AT INTEC.
6110: ELECTRICAL CONTROL EQUIPMENT

  DEDT0006447     DEEM0002169  
Thursday, February 27, 2014
$2,251.50
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MOD 008 - DEFINITIZE MOD 001 FOR TRANSFORMER TESTING IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Friday, February 21, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. MOD 007 - TIME EXTENSION IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Thursday, January 30, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT, DSW, G5600, IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Wednesday, January 22, 2014
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
MOD 0005 - ADD SHOO-FLY FOR THE LONGTIN SUBSTATION PROJECT, WESTERN AREA POWER ADMINISTRATION, DESERT SW REGION. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Friday, December 20, 2013
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
MOD 004 FOR A NO-COST TIME EXTENSION ON THE LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT.WESTERN AREA POWER ADMINISTRATION, DESERT SOUTHWEST REGION. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Monday, December 9, 2013
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
MOD 0003 - TO CHANGE DELIVERY DATES FOR GOVERNMENT-FURNISHED EQUIPMENT ON THE LONGTIN SUBSTATION, STAGE 02 PROJECT. WESTERN AREA POWER ADMINISTRATION, DESERT SOUTHWEST REGION. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Thursday, October 31, 2013
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
MOD 0002 - INCREMENTAL FUNDING MOD ONLY FOR LONGTIN SUB, STAGE 02, WESTERN AREA POWER ADMINISTRATION, DESERT SOUTHWEST REGION. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Friday, October 11, 2013
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT, MOD FOR TRANSFORMER TESTING, IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Wednesday, September 18, 2013
$0.00
8900: ENERGY, DEPARTMENT OF
00007: IDAHO OPERATIONS OFFICE

IDC Indefinite Delivery Contract
METER INSTALLATION FOR EM. ADMINISTRATIVE MODIFICATION TO CORRECT A SYSTEMS ISSUE.
6110: ELECTRICAL CONTROL EQUIPMENT

  DEEM0002169     DE-SOL-0004088  
Tuesday, September 17, 2013
$44,320.00
8900: ENERGY, DEPARTMENT OF
00007: IDAHO OPERATIONS OFFICE

DO Delivery Order
INSTALL ELECTRICAL METERS IN SELECT BUILDINGS AT INTEC.
6110: ELECTRICAL CONTROL EQUIPMENT

  DEDT0006447     DEEM0002169  
Thursday, September 12, 2013
$0.00
8900: ENERGY, DEPARTMENT OF
00007: IDAHO OPERATIONS OFFICE

IDC Indefinite Delivery Contract
METER INSTALLATION FOR EM. ADMINISTRATIVE MODIFICATION TO CORRECT A SYSTEMS ISSUE.
6110: ELECTRICAL CONTROL EQUIPMENT

  DEEM0002169     DE-SOL-0004088  
Tuesday, September 10, 2013
$0.21
1400: Department of the Interior
00010: BOISE REGIONAL OFFICE

D: DEFINITIVE CONTRACT
IGF::OT::IGF OTHER FUNCTIONS CORRECT A FUNDING ERROR FROM MODIFICATION 002. ERRONEOUSLY OBLIGATED .21 LESS THAN REQUIRED.
Z2MF: REPAIR OR ALTERATION OF EPG FACILITIES - PETROLEUM

  INR13PC10007     R13PS10007  
Monday, September 9, 2013
$0.00
8900: ENERGY, DEPARTMENT OF
00007: IDAHO OPERATIONS OFFICE

IDC Indefinite Delivery Contract
METER INSTALLATION FOR EM.
6110: ELECTRICAL CONTROL EQUIPMENT

  DEEM0002169     DE-SOL-0004088  
Monday, August 19, 2013
$0.00
1400: Department of the Interior
00010: BOISE REGIONAL OFFICE

D: DEFINITIVE CONTRACT
IGF::OT::IGF OTHER FUNCTIONS
Z2MF: REPAIR OR ALTERATION OF EPG FACILITIES - PETROLEUM

  INR13PC10007     R13PS10007  
Thursday, August 8, 2013
$0.00
8900: ENERGY, DEPARTMENT OF
00066: WESTERN-DESERT SOUTHWEST REGION

DCA Definitive Contract
LONGTIN SUBSTATION, STAGE 02 CONSTRUCTION PROJECT. IGF::OT::IGF
Y1NZ: CONSTRUCTION OF OTHER UTILITIES

  DEWA0001234     DE-SOL-0005448  
Wednesday, April 24, 2013
$4,423.39
1400: INTERIOR, DEPARTMENT OF THE
00010: BOISE REGIONAL OFFICE

DCA Definitive Contract
IGF::OT::IGF INSTALL GROUNDING CABLE AND INSTALL NEMA ENCLOSURE.
Z2MF: REPAIR OR ALTERATION OF EPG FACILITIES - PETROLEUM

  INR13PC10007     R13PS10007  
Monday, February 11, 2013
$0.00
1400: INTERIOR, DEPARTMENT OF THE
00010: BOISE REGIONAL OFFICE

DCA Definitive Contract
IGF::OT::IGF INCORPORATES REVISED DRAWING
Z2MF: REPAIR OR ALTERATION OF EPG FACILITIES - PETROLEUM

  INR13PC10007     R13PS10007  
Friday, November 30, 2012
$172,525.75
1400: INTERIOR, DEPARTMENT OF THE
00010: BOISE REGIONAL OFFICE

DCA Definitive Contract
IGF::OT::IGF AWARD TRANSFORMER INSTALLATION
Z2MF: REPAIR OR ALTERATION OF EPG FACILITIES - PETROLEUM

  INR13PC10007     R13PS10007  
Friday, October 12, 2012
$0.00
8900: ENERGY, DEPARTMENT OF
00007: IDAHO OPERATIONS OFFICE

IDC Indefinite Delivery Contract
METER INSTALLATION FOR EM.
6110: ELECTRICAL CONTROL EQUIPMENT

  DEEM0002169     DE-SOL-0004088  
Tuesday, January 31, 2012
$11,760.00
1200: AGRICULTURE, DEPARTMENT OF
95CV: USDA ARS PWA 95CV

PO Purchase Order
PROVIDE ELECTRICAL POLE, TRANSFORMER, OVERHEAD LINE AND ASSOCIATED ELECTRICAL REPAIR SERVICE
J059: MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS

  AG95CVP120018  
Tuesday, May 3, 2011
$5,614.11
1200: AGRICULTURE, DEPARTMENT OF
95CV: USDA ARS PWA 95CV

PO Purchase Order
PROVIDE AND INSTALL 40' POWER POLE, REMOVE EXISTING BROKEN POLE, INCLUDING TURN OFF POWER, REMOVE HIGH VOLTAGE POWER LINES, INSTALL WIRE HOLDERS&ELECTRIC WIRES TO NEW POLE, AND RECONNECT POWER TO LINES AND VERIFY POWER AT TRANSFORMER. EMERGENCY WORK.
Z127: MAINT-REP-ALT/ELCT & COMM SYS FAC

  AG95CVP11A505  
Wednesday, April 20, 2011
$4,098.75
1200: AGRICULTURE, DEPARTMENT OF
95CV: USDA ARS PWA 95CV

PO Purchase Order
ELECTRICAL POLE INSTALL AND RMOVAL
Y127: CONSTRUCT/ELCT & COMM SYSTEM FAC

  AG95CVP11AA19